How to buy aspace capsule house
Seven steps from the first message to capsule houses on their footings — with the seller, terms and responsibilities written down before any payment.
01. Share your project
Start with the site, not the catalogue.
Destination, intended use, number of units and timeline. Photos or a site plan help us understand the ground and access.

02. Compare suitable models
Models matched to the brief.
We shortlist models against current specifications and explain the trade-offs: size, layout, glazing and climate options.

03. Receive a written quotation
Current, itemised and dated.
A current quotation states the model and configuration, quantity, port and Incoterm, exclusions and how long the price holds.

04. Confirm the contract
Everything named before payment.
The seller, payment terms, delivery terms and service responsibilities are set out in writing before any payment is made.

05. Production & packing
Built and fitted out as one module.
Cabins are built to the confirmed configuration, fitted out, then wrapped, braced and strapped for sea freight.

06. Shipping
Wrapped, braced and strapped.
Units leave the port of loading on the agreed terms. Freight, insurance and import clearance responsibilities follow the quotation.

07. Arrival & placement
Lifted onto prepared footings.
Each module is lifted onto prepared footings and connected to utilities. The scope of any installation support is confirmed per project.

- 01
Access
Room for a truck and a mobile crane to reach the final position.
- 02
Footings
Level concrete piers or strip footings sized for the unit.
- 03
Power
A supply that matches the unit's load, from grid, generator or solar.
- 04
Water & drainage
Fresh water in, wastewater out — to a sewer, tank or treatment system.
- 05
Approvals
Local planning, building and use permits for the intended purpose.
- 06
Climate
Wind, snow, heat and humidity, which shape the configuration.
- 01
Model & configuration
Model code, layout, finishes and every option included.
- 02
Quantity
Number of units, as packing and freight change with quantity.
- 03
Port & terms
Port of loading and the Incoterm (for example FOB).
- 04
Exclusions
What is not included: foundations, freight, duties, installation.
- 05
Validity & seller
How long the price holds and which company sells and receives payment.

